Rigging Session 2026 brought together professionals from theaters, production, rental, engineering and freelance technicians at Stonex to talk about rigging from the field.
The session revolved around situations that continually arise in setups and installations: how to correctly assess a maneuver, who should have the overall vision of the rigging, what happens when a production changes venues, or how far regulatory compliance actually goes.
And, above all, there were questions. Many. Because when you talk about suspended loads, control, and safety, doubts arise quickly.
The coordination of rigging in increasingly complex productions
One of the first topics we put on the table was how we at Stonex understand a project of stage mechanics and rigging.
An engine is part of something much larger. Control, sensors, load cells, brakes, limit switches, drives, structures, suspension components, and communications all have to work together.
The conversation focused precisely on that: on moving away from looking at components in isolation and analyzing what happens during operation, how maintenance will be performed, and how the system will respond if a failure occurs. This is a way of working that we also apply to our... engineering and integration projects.
Complying with regulations is only one part of safety
Another important debate arose around a very specific question: whether all components comply with the relevant regulations, Can we automatically consider the assembly to be safe?
The equipment may meet the requirements, but safety also depends on how the maneuver has been planned, how the systems are used, how the operations are coordinated, and what decisions are made during assembly.
Regulations, technology, and technical expertise must go hand in hand. In rigging, focusing solely on one of them leaves too much out.
Open debate: inspections, maintenance and responsibilities
The final part of Rigging Session turned into an open exchange between attendees and speakers.
Questions arose regarding maintenance, inspections, documentation, responsibilities, proper equipment use, and situations encountered in real-world installations and spaces on a daily basis. There were also questions about when a system requires a more thorough review or how to respond to unforeseen circumstances.
That exchange ended up being one of the most interesting parts of the morning because it allowed many of the issues discussed during the sessions to be brought down to concrete, everyday problems.
Rigging Session 2026 was born precisely with that intention: to put real situations on the table and compare them between professionals who work with them from different positions.
Do any of these issues also appear in your project?
If you are reviewing a rigging installation, planning a new maneuver, or have questions about control, loads, coordination, maintenance, or the integration of the different elements of the system, our technical team can help you analyze it.
At Stonex we work on stage mechanics projects from engineering and integration, first studying how the system has to work before deciding what equipment it needs.
Talk to the Stonex team and tell us about your case
Thank you to everyone who participated, shared your experience, and kept asking questions until the end. After this first Rigging Session, one thing is clear: we have a long conversation ahead of us.
We continue!


